Cost Breakdown
Name/Model: Mahout Battle Armor IFV
Technology: Inner Sphere
Tonnage: 65
Configuration: Tracked Combat Vehicle
=================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------
Armor (Vehicular Stealth) (232 pts) 14.5 x 50,000 725,000.00
Internal Structure (Standard) 6.5 x 10,000 (+) 65,000.00 = 790,000.00
Control Components 3.5 x 10,000 (+) 35,000.00 = 825,000.00
Engine (Light Fusion) (15,000 x 260 x 65) / 75 (+) 3,380,000.00 = 4,205,000.00
Turret 1.5 x 5,000 (+) 7,500.00 = 4,212,500.00
-----------------------------------------------------------------------------------------------------------------
Total Structural Cost 4,212,500.00
=================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------
Angel ECM Suite 750,000 750,000.00
Anti-Missile System 100,000 (+) 100,000.00 = 850,000.00
Anti-Missile System 100,000 (+) 100,000.00 = 950,000.00
Anti-Missile System 100,000 (+) 100,000.00 = 1,050,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 1,050,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 1,050,000.00
CASE 50,000 (+) 50,000.00 = 1,100,000.00
Compartment, Battle Armor (4 ton) 8 x 0 (+) 0.00 = 1,100,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 1,500,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,500,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,500,000.00
-----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,500,000.00
=================================================================================================================
Combat Vehicle Cost
-----------------------------------------------------------------------------------------------------------------
Structural Cost 4,212,500.00
Weapons and Equipment Cost (+) 1,500,000.00 = 5,712,500.00
Combat Vehicle Cost Multiplier 1 + (65 / 100) (*) 1.65 = 9,425,625.00
-----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 9,425,625.00
|