Cost Breakdown
Name/Model: Kinnol MBT (PPC)
Technology: Inner Sphere
Tonnage: 70
Configuration: Tracked Combat Vehicle
=========================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (215 pts) 12.0 x 20,000 240,000.00
Internal Structure (Standard) 7.0 x 10,000 (+) 70,000.00 = 310,000.00
Control Components 3.5 x 10,000 (+) 35,000.00 = 345,000.00
Engine (XL) (20,000 x 350 x 70) / 75 (+) 6,533,333.33 = 6,878,333.33
Heat Sinks (Single) 3 x 2,000 (+) 6,000.00 = 6,884,333.33
Turret 1 x 5,000 (+) 5,000.00 = 6,889,333.33
---------------------------------------------------------------------------------------------------------
Total Structural Cost 6,889,333.33
=========================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------
C3 Slave 250,000 250,000.00
CASE 50,000 (+) 50,000.00 = 300,000.00
Machine Gun 5,000 (+) 5,000.00 = 305,000.00
Machine Gun 5,000 (+) 5,000.00 = 310,000.00
Machine Gun 5,000 (+) 5,000.00 = 315,000.00
Machine Gun (Ammo 200) [Empty Bin] 0 (+) 0.00 = 315,000.00
Medium Laser 40,000 (+) 40,000.00 = 355,000.00
MML 5 75,000 (+) 75,000.00 = 430,000.00
MML 5 75,000 (+) 75,000.00 = 505,000.00
MML 5 (Ammo 20) [SRM] [Empty Bin] 0 (+) 0.00 = 505,000.00
MML 5 (Ammo 24) [LRM] [Empty Bin] 0 (+) 0.00 = 505,000.00
MML 5 (Ammo 24) [LRM] [Empty Bin] 0 (+) 0.00 = 505,000.00
PPC 200,000 (+) 200,000.00 = 705,000.00
---------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 705,000.00
=========================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------
Structural Cost 6,889,333.33
Weapons and Equipment Cost (+) 705,000.00 = 7,594,333.33
Combat Vehicle Cost Multiplier 1 + (70 / 100) (*) 1.7 = 12,910,366.67
---------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 12,910,367.00
|