Cost Breakdown
Name/Model: Vedette
Technology: Inner Sphere
Tonnage: 50
Configuration: Tracked Combat Vehicle
===============================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (107 pts) 6.0 x 20,000 120,000.00
Internal Structure (Standard) 5.0 x 10,000 (+) 50,000.00 = 170,000.00
Control Components 2.5 x 10,000 (+) 25,000.00 = 195,000.00
Engine (Fusion) (5,000 x 250 x 50) / 75 (+) 833,333.33 = 1,028,333.33
Turret 1.5 x 5,000 (+) 7,500.00 = 1,035,833.33
---------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,035,833.33
===============================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------
LB 20-X AC 600,000 600,000.00
LB 20-X AC (Ammo 5) [Cluster] [Empty Bin] 0 (+) 0.00 = 600,000.00
LB 20-X AC (Ammo 5) [Empty Bin] 0 (+) 0.00 = 600,000.00
---------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 600,000.00
===============================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------
Structural Cost 1,035,833.33
Weapons and Equipment Cost (+) 600,000.00 = 1,635,833.33
Combat Vehicle Cost Multiplier 1 + (50 / 100) (*) 1.5 = 2,453,750.00
---------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 2,453,750.00
|