Cost Breakdown
Name/Model: Tuatha “Afanc”
Technology: Inner Sphere
Tonnage: 70
Configuration: Biped BattleMech
======================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------------
Armor (Standard): (216 pts) 13.5 x 10,000 135,000.00
Internal Structure (Standard): 70 x 400 x 1 (+) 28,000.00 = 163,000.00
Myomer (MASC): (280 x 4 x 1,000) + (70 x 2,000) (+) 1,260,000.00 = 1,423,000.00
Engine (XL): (20,000 x 280 x 70) / 75 (+) 5,226,666.67 = 6,649,666.67
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 7,549,666.67
Cockpit (Standard): 200,000 (+) 200,000.00 = 7,749,666.67
Life Support: 50,000 (+) 50,000.00 = 7,799,666.67
Sensors: 70 x 2,000 (+) 140,000.00 = 7,939,666.67
Heat Sinks (Double): 13 x 6,000 (+) 78,000.00 = 8,017,666.67
Arm Actuators: 70 x ((100 x 2) + (50 x 1) + (80 x 1)) (+) 23,100.00 = 8,040,766.67
Leg Actuators: 70 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 49,000.00 = 8,089,766.67
----------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 8,089,766.67
======================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------------
Chameleon LPS 600,000 600,000.00
ER Large Laser 200,000 (+) 200,000.00 = 800,000.00
ER Large Laser 200,000 (+) 200,000.00 = 1,000,000.00
Gauss Rifle 300,000 (+) 300,000.00 = 1,300,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 1,300,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 1,300,000.00
Guardian ECM Suite 200,000 (+) 200,000.00 = 1,500,000.00
Null-Signature System 1,400,000 (+) 1,400,000.00 = 2,900,000.00
----------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 2,900,000.00
======================================================================================================================
BattleMech Cost
----------------------------------------------------------------------------------------------------------------------
Structural Cost: 8,089,766.67
Weapons and Equipment Cost: (+) 2,900,000.00 = 10,989,766.67
BattleMech Cost Multiplier: 1 + (70 / 100) (*) 1.70 = 18,682,603.33
----------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 18,682,603.00
|