Cost Breakdown
Name/Model: XM9 Heavy Striker Vehicle XM9-1
Technology: Inner Sphere
Tonnage: 50
Configuration: Hover Combat Vehicle
===============================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous (Prototype)) (172 pts) 10.0 x 60,000 600,000.00
Internal Structure (Standard) 5.0 x 10,000 (+) 50,000.00 = 650,000.00
Control Components 2.5 x 10,000 (+) 25,000.00 = 675,000.00
Lift/Dive Equipment 5 x 20,000 (+) 100,000.00 = 775,000.00
Engine (Fuel Cell) (3,500 x 165 x 50) / 75 (+) 385,000.00 = 1,160,000.00
Heat Sinks (Single) 10 x 2,000 (+) 20,000.00 = 1,180,000.00
Turret 0.5 x 5,000 (+) 2,500.00 = 1,182,500.00
Power Amplifiers 0.5 x 20,000 (+) 10,000.00 = 1,192,500.00
---------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,192,500.00
===============================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
Guardian ECM Suite (Prototype) 1,000,000 (+) 1,000,000.00 = 1,100,000.00
Medium Laser (Prototype) 40,000 (+) 40,000.00 = 1,140,000.00
Medium Laser (Prototype) 40,000 (+) 40,000.00 = 1,180,000.00
TAG 50,000 (+) 50,000.00 = 1,230,000.00
---------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,230,000.00
===============================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------
Structural Cost 1,192,500.00
Weapons and Equipment Cost (+) 1,230,000.00 = 2,422,500.00
Combat Vehicle Cost Multiplier 1 + (50 / 50) (*) 2 = 4,845,000.00
---------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 4,845,000.00
|