|                  Cost Breakdown
Name/Model:         J. Edgar Light Hover Tank (Kurita)
Technology:         Inner Sphere
Tonnage:            25
Configuration:      Hover Combat Vehicle
=======================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------
  Armor (Ferro-Fibrous)              (107 pts) 6.0 x 20,000              120,000.00                    
  Internal Structure (Standard)      2.5 x 10,000             (+)         25,000.00  =       145,000.00
  Control Components                 1.5 x 10,000             (+)         15,000.00  =       160,000.00
  Lift/Dive Equipment                2.5 x 20,000             (+)         50,000.00  =       210,000.00
  Engine (Fusion)                    (5,000 x 145 x 25) / 75  (+)        241,666.67  =       451,666.67
  Turret                             0.5 x 5,000              (+)          2,500.00  =       454,166.67
-------------------------------------------------------------------------------------------------------
Total Structural Cost                                                                        454,166.67
=======================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------
  C3 Slave                           250,000                             250,000.00                    
  Medium Laser                       40,000                   (+)         40,000.00  =       290,000.00
  Medium Laser                       40,000                   (+)         40,000.00  =       330,000.00
  Medium Laser                       40,000                   (+)         40,000.00  =       370,000.00
  Small Laser                        11,250                   (+)         11,250.00  =       381,250.00
-------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost                                                             381,250.00
=======================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------
  Structural Cost                                                        454,166.67                    
  Weapons and Equipment Cost                                  (+)        381,250.00  =       835,416.67
  Combat Vehicle Cost Multiplier     1 + (25 / 50)            (*)               1.5  =     1,253,125.00
-------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost                                                                  1,253,125.00
 |