Cost Breakdown
Name/Model: Fulcrum Heavy Hover Tank (Hybrid)
Technology: Inner Sphere (Mixed)
Tonnage: 50
Configuration: Hover Combat Vehicle
===============================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------
Armor (Reactive) (160 pts) 10.0 x 30,000 300,000.00
Internal Structure (Standard) 5.0 x 10,000 (+) 50,000.00 = 350,000.00
Control Components 2.5 x 10,000 (+) 25,000.00 = 375,000.00
Lift/Dive Equipment 5 x 20,000 (+) 100,000.00 = 475,000.00
Engine (Fusion) (5,000 x 165 x 50) / 75 (+) 550,000.00 = 1,025,000.00
Turret 0.5 x 5,000 (+) 2,500.00 = 1,027,500.00
---------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,027,500.00
===============================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------
Angel ECM Suite 750,000 750,000.00
Armored Motive System 7.5 x 100,000 (+) 750,000.00 = 1,500,000.00
MagShot Gauss Rifle 8,500 (+) 8,500.00 = 1,508,500.00
MagShot Gauss Rifle 8,500 (+) 8,500.00 = 1,517,000.00
MagShot Gauss Rifle 8,500 (+) 8,500.00 = 1,525,500.00
MagShot Gauss Rifle (Ammo 50) [Empty Bin] 0 (+) 0.00 = 1,525,500.00
Medium Pulse Laser (C) 60,000 (+) 60,000.00 = 1,585,500.00
Medium Pulse Laser (C) 60,000 (+) 60,000.00 = 1,645,500.00
Supercharger 165 x 10,000 (+) 1,650,000.00 = 3,295,500.00
---------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 3,295,500.00
===============================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------
Structural Cost 1,027,500.00
Weapons and Equipment Cost (+) 3,295,500.00 = 4,323,000.00
Combat Vehicle Cost Multiplier 1 + (50 / 50) (*) 2 = 8,646,000.00
---------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 8,646,000.00
|