Cost Breakdown
Name/Model: Griffin GRF-3S
Technology: Inner Sphere
Tonnage: 55
Configuration: Biped BattleMech
================================================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------------------------------
Armor (Standard): (160 pts) 10.0 x 10,000 100,000.00
Internal Structure (Standard): 55 x 400 x 1 (+) 22,000.00 = 122,000.00
Myomer (Standard): 55 x 2,000 (+) 110,000.00 = 232,000.00
Engine (XL): (20,000 x 275 x 55) / 75 (+) 4,033,333.33 = 4,265,333.33
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 5,165,333.33
Cockpit (Standard): 200,000 (+) 200,000.00 = 5,365,333.33
Life Support: 50,000 (+) 50,000.00 = 5,415,333.33
Sensors: 55 x 2,000 (+) 110,000.00 = 5,525,333.33
Heat Sinks (Single): 2 x 2,000 (+) 4,000.00 = 5,529,333.33
Arm Actuators: 55 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 25,300.00 = 5,554,633.33
Leg Actuators: 55 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 38,500.00 = 5,593,133.33
--------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 5,593,133.33
================================================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
Jump Jets 55 x (5 x 5) x 200 (+) 275,000.00 = 325,000.00
Large Pulse Laser 175,000 (+) 175,000.00 = 500,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 900,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 900,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 900,000.00
Small Laser 11,250 (+) 11,250.00 = 911,250.00
--------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 911,250.00
================================================================================================================================
BattleMech Cost
--------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 5,593,133.33
Weapons and Equipment Cost: (+) 911,250.00 = 6,504,383.33
BattleMech Cost Multiplier: 1 + (55 / 100) (*) 1.55 = 10,081,794.17
--------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 10,081,794.00
|