Cost Breakdown
Name/Model: Burke (Anvil)
Technology: Inner Sphere
Tonnage: 75
Configuration: Tracked Combat Vehicle
========================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (248 pts) 12.5 x 25,000 312,500.00
Internal Structure (Standard) 7.5 x 10,000 (+) 75,000.00 = 387,500.00
Control Components 4 x 10,000 (+) 40,000.00 = 427,500.00
Engine (XL) (20,000 x 225 x 75) / 75 (+) 4,500,000.00 = 4,927,500.00
Heat Sinks (Single) 17 x 2,000 (+) 34,000.00 = 4,961,500.00
Turret 2.5 x 5,000 (+) 12,500.00 = 4,974,000.00
--------------------------------------------------------------------------------------------------------
Total Structural Cost 4,974,000.00
========================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------
Large Re-engineered Laser 250,000 250,000.00
Large Re-engineered Laser 250,000 (+) 250,000.00 = 500,000.00
Large Re-engineered Laser 250,000 (+) 250,000.00 = 750,000.00
--------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 750,000.00
========================================================================================================
Combat Vehicle Cost
--------------------------------------------------------------------------------------------------------
Structural Cost 4,974,000.00
Weapons and Equipment Cost (+) 750,000.00 = 5,724,000.00
Combat Vehicle Cost Multiplier 1 + (75 / 100) (*) 1.75 = 10,017,000.00
--------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 10,017,000.00
|