Cost Breakdown
Name/Model: AC/5 Carrier (LB-X)
Technology: Inner Sphere
Tonnage: 60
Configuration: Tracked Combat Vehicle
===============================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (89 pts) 4.5 x 25,000 112,500.00
Internal Structure (Standard) 6.0 x 10,000 (+) 60,000.00 = 172,500.00
Control Components 3 x 10,000 (+) 30,000.00 = 202,500.00
Engine (Fuel Cell) (3,500 x 180 x 60) / 75 (+) 504,000.00 = 706,500.00
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 708,500.00
---------------------------------------------------------------------------------------------------------------
Total Structural Cost 708,500.00
===============================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------
C3 Slave 250,000 250,000.00
LB 5-X AC 250,000 (+) 250,000.00 = 500,000.00
LB 5-X AC 250,000 (+) 250,000.00 = 750,000.00
LB 5-X AC 250,000 (+) 250,000.00 = 1,000,000.00
LB 5-X AC 250,000 (+) 250,000.00 = 1,250,000.00
LB 5-X AC (Ammo 20) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,250,000.00
LB 5-X AC (Ammo 20) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,250,000.00
LB 5-X AC (Ammo 20) [Empty Bin] 0 (+) 0.00 = 1,250,000.00
LB 5-X AC (Ammo 20) [Empty Bin] 0 (+) 0.00 = 1,250,000.00
LB 5-X AC (Ammo 20) [Empty Bin] 0 (+) 0.00 = 1,250,000.00
---------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,250,000.00
===============================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------
Structural Cost 708,500.00
Weapons and Equipment Cost (+) 1,250,000.00 = 1,958,500.00
Combat Vehicle Cost Multiplier 1 + (60 / 100) (*) 1.6 = 3,133,600.00
---------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 3,133,600.00
|