Cost Breakdown
Name/Model: Foray Urban Cavalry Tank (F.U.C.T.)
Technology: Inner Sphere
Tonnage: 60
Configuration: Wheeled Combat Vehicle
=================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (248 pts) 12.5 x 25,000 312,500.00
Internal Structure (Standard) 6.0 x 10,000 (+) 60,000.00 = 372,500.00
Control Components 3 x 10,000 (+) 30,000.00 = 402,500.00
Engine (XL) (20,000 x 280 x 60) / 75 (+) 4,480,000.00 = 4,882,500.00
Turret 1.5 x 5,000 (+) 7,500.00 = 4,890,000.00
-----------------------------------------------------------------------------------------------------------------
Total Structural Cost 4,890,000.00
=================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------
Cargo, Standard (1 ton) 2 x 0 0.00
CASE 50,000 (+) 50,000.00 = 50,000.00
Guardian ECM Suite 200,000 (+) 200,000.00 = 250,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 650,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 650,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 650,000.00
Medium VSP Laser 200,000 (+) 200,000.00 = 850,000.00
Small X-Pulse Laser 31,000 (+) 31,000.00 = 881,000.00
Targeting Computer 4 x 10,000 (+) 40,000.00 = 921,000.00
-----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 921,000.00
=================================================================================================================
Combat Vehicle Cost
-----------------------------------------------------------------------------------------------------------------
Structural Cost 4,890,000.00
Weapons and Equipment Cost (+) 921,000.00 = 5,811,000.00
Combat Vehicle Cost Multiplier 1 + (60 / 200) (*) 1.3 = 7,554,300.00
-----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 7,554,300.00
|