Cost Breakdown
Name/Model: Hovertank Testbed 2
Technology: Inner Sphere
Tonnage: 50
Configuration: Hover Combat Vehicle
=================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (143 pts) 8.0 x 20,000 160,000.00
Internal Structure (Standard) 5.0 x 10,000 (+) 50,000.00 = 210,000.00
Control Components 2.5 x 10,000 (+) 25,000.00 = 235,000.00
Lift/Dive Equipment 5 x 20,000 (+) 100,000.00 = 335,000.00
Engine (XL) (20,000 x 265 x 50) / 75 (+) 3,533,333.33 = 3,868,333.33
Turret 1.5 x 5,000 (+) 7,500.00 = 3,875,833.33
-----------------------------------------------------------------------------------------------------------------
Total Structural Cost 3,875,833.33
=================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------
Small Laser 11,250 11,250.00
Thumper 187,500 (+) 187,500.00 = 198,750.00
Thumper (Ammo 20) [Cluster] [Empty Bin] 0 (+) 0.00 = 198,750.00
Thumper (Ammo 20) [Copperhead] [Empty Bin] 0 (+) 0.00 = 198,750.00
-----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 198,750.00
=================================================================================================================
Combat Vehicle Cost
-----------------------------------------------------------------------------------------------------------------
Structural Cost 3,875,833.33
Weapons and Equipment Cost (+) 198,750.00 = 4,074,583.33
Combat Vehicle Cost Multiplier 1 + (50 / 50) (*) 2 = 8,149,166.67
-----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 8,149,167.00
|