Cost Breakdown
Name/Model: Sledgehammer Heavy Tank (Fusion)
Technology: Inner Sphere
Tonnage: 100
Configuration: Tracked Combat Vehicle
=========================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------
Armor (Standard) (240 pts) 15.0 x 10,000 150,000.00
Internal Structure (Standard) 10.0 x 10,000 (+) 100,000.00 = 250,000.00
Control Components 5 x 10,000 (+) 50,000.00 = 300,000.00
Engine (Fusion) (5,000 x 300 x 100) / 75 (+) 2,000,000.00 = 2,300,000.00
Heat Sinks (Single) 10 x 2,000 (+) 20,000.00 = 2,320,000.00
Turret 2.5 x 5,000 (+) 12,500.00 = 2,332,500.00
---------------------------------------------------------------------------------------------------------
Total Structural Cost 2,332,500.00
=========================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------
LRM 5 30,000 30,000.00
LRM 5 30,000 (+) 30,000.00 = 60,000.00
LRM 5 (Ammo 24) [Empty Bin] 0 (+) 0.00 = 60,000.00
LRM 5 (Ammo 24) [Empty Bin] 0 (+) 0.00 = 60,000.00
Machine Gun 5,000 (+) 5,000.00 = 65,000.00
Machine Gun 5,000 (+) 5,000.00 = 70,000.00
Machine Gun 5,000 (+) 5,000.00 = 75,000.00
Machine Gun 5,000 (+) 5,000.00 = 80,000.00
Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 80,000.00
PPC 200,000 (+) 200,000.00 = 280,000.00
PPC 200,000 (+) 200,000.00 = 480,000.00
Recon Camera 10,000 (+) 10,000.00 = 490,000.00
SRM 4 60,000 (+) 60,000.00 = 550,000.00
SRM 4 60,000 (+) 60,000.00 = 610,000.00
SRM 4 (Ammo 25) [Empty Bin] 0 (+) 0.00 = 610,000.00
SRM 4 (Ammo 25) [Empty Bin] 0 (+) 0.00 = 610,000.00
---------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 610,000.00
=========================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------
Structural Cost 2,332,500.00
Weapons and Equipment Cost (+) 610,000.00 = 2,942,500.00
Combat Vehicle Cost Multiplier 1 + (100 / 100) (*) 2 = 5,885,000.00
---------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 5,885,000.00
|