Cost Breakdown
Name/Model: Pike Support Vehicle (LB-X)
Technology: Inner Sphere
Tonnage: 60
Configuration: Tracked Combat Vehicle
===============================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (170 pts) 9.5 x 20,000 190,000.00
Internal Structure (Standard) 6.0 x 10,000 (+) 60,000.00 = 250,000.00
Control Components 3 x 10,000 (+) 30,000.00 = 280,000.00
Engine (Fuel Cell) (3,500 x 180 x 60) / 75 (+) 504,000.00 = 784,000.00
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 786,000.00
Turret 2.5 x 5,000 (+) 12,500.00 = 798,500.00
---------------------------------------------------------------------------------------------------------------
Total Structural Cost 798,500.00
===============================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
LB 5-X AC 250,000 (+) 250,000.00 = 300,000.00
LB 5-X AC 250,000 (+) 250,000.00 = 550,000.00
LB 5-X AC 250,000 (+) 250,000.00 = 800,000.00
LB 5-X AC (Ammo 20) [Cluster] [Empty Bin] 0 (+) 0.00 = 800,000.00
LB 5-X AC (Ammo 20) [Empty Bin] 0 (+) 0.00 = 800,000.00
LB 5-X AC (Ammo 20) [Empty Bin] 0 (+) 0.00 = 800,000.00
SRM 2 10,000 (+) 10,000.00 = 810,000.00
SRM 2 10,000 (+) 10,000.00 = 820,000.00
SRM 2 (Ammo 50) [Empty Bin] 0 (+) 0.00 = 820,000.00
---------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 820,000.00
===============================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------
Structural Cost 798,500.00
Weapons and Equipment Cost (+) 820,000.00 = 1,618,500.00
Combat Vehicle Cost Multiplier 1 + (60 / 100) (*) 1.6 = 2,589,600.00
---------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 2,589,600.00
|