Cost Breakdown
Name/Model: Challenger MBT XIVs
Technology: Inner Sphere
Tonnage: 90
Configuration: Tracked Combat Vehicle
=================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (248 pts) 12.5 x 25,000 312,500.00
Internal Structure (Standard) 9.0 x 10,000 (+) 90,000.00 = 402,500.00
Control Components 4.5 x 10,000 (+) 45,000.00 = 447,500.00
Engine (XL) (20,000 x 270 x 90) / 75 (+) 6,480,000.00 = 6,927,500.00
Heat Sinks (Single) 4 x 2,000 (+) 8,000.00 = 6,935,500.00
Turret 2.5 x 5,000 (+) 12,500.00 = 6,948,000.00
-----------------------------------------------------------------------------------------------------------------
Total Structural Cost 6,948,000.00
=================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
ER Large Laser 200,000 (+) 200,000.00 = 300,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 700,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 700,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 700,000.00
MML 7 105,000 (+) 105,000.00 = 805,000.00
MML 7 (Ammo 14) [SRM] [Empty Bin] 0 (+) 0.00 = 805,000.00
MML 7 (Ammo 17) [LRM] [Empty Bin] 0 (+) 0.00 = 805,000.00
Small Pulse Laser 16,000 (+) 16,000.00 = 821,000.00
SRM 4 60,000 (+) 60,000.00 = 881,000.00
SRM 4 (Ammo 25) [Empty Bin] 0 (+) 0.00 = 881,000.00
SRT 4 60,000 (+) 60,000.00 = 941,000.00
SRT 4 (Ammo 25) [Empty Bin] 0 (+) 0.00 = 941,000.00
Streak SRM 2 15,000 (+) 15,000.00 = 956,000.00
Streak SRM 2 15,000 (+) 15,000.00 = 971,000.00
Streak SRM 2 (Ammo 50) [Empty Bin] 0 (+) 0.00 = 971,000.00
-----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 971,000.00
=================================================================================================================
Combat Vehicle Cost
-----------------------------------------------------------------------------------------------------------------
Structural Cost 6,948,000.00
Weapons and Equipment Cost (+) 971,000.00 = 7,919,000.00
Combat Vehicle Cost Multiplier 1 + (90 / 100) (*) 1.9 = 15,046,100.00
Environmental Sealing 15,046,100.00 x 0.25 (+) 3,761,525.00 = 18,807,625.00
-----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 18,807,625.00
|