Cost Breakdown
Name/Model: Schrek PPC Carrier (C3M)
Technology: Inner Sphere
Tonnage: 80
Configuration: Tracked Combat Vehicle
===============================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------
Armor (Standard) (120 pts) 7.5 x 10,000 75,000.00
Internal Structure (Standard) 8.0 x 10,000 (+) 80,000.00 = 155,000.00
Control Components 4 x 10,000 (+) 40,000.00 = 195,000.00
Engine (Fusion) (5,000 x 240 x 80) / 75 (+) 1,280,000.00 = 1,475,000.00
Heat Sinks (Single) 15 x 2,000 (+) 30,000.00 = 1,505,000.00
Turret 2 x 5,000 (+) 10,000.00 = 1,515,000.00
---------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,515,000.00
===============================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
C3 Computer (Master) 1,500,000 (+) 1,500,000.00 = 1,600,000.00
Guardian ECM Suite 200,000 (+) 200,000.00 = 1,800,000.00
Light PPC 150,000 (+) 150,000.00 = 1,950,000.00
PPC 200,000 (+) 200,000.00 = 2,150,000.00
PPC 200,000 (+) 200,000.00 = 2,350,000.00
---------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 2,350,000.00
===============================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------
Structural Cost 1,515,000.00
Weapons and Equipment Cost (+) 2,350,000.00 = 3,865,000.00
Combat Vehicle Cost Multiplier 1 + (80 / 100) (*) 1.8 = 6,957,000.00
---------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 6,957,000.00
|