|                  Cost Breakdown
Name/Model:         Knight Questoris (Gallant) KNT-QT-G1
Technology:         Inner Sphere
Tonnage:            55
Configuration:      Biped BattleMech
=====================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------
  Armor (Standard):                (185 pts) 12.0 x 10,000                             120,000.00                    
  Internal Structure (Endo Steel): 55 x 1,600 x 1                           (+)         88,000.00  =       208,000.00
  Myomer (Triple-Strength):        55 x 16,000                              (+)        880,000.00  =     1,088,000.00
  Engine (Fusion):                 (5,000 x 330 x 55) / 75                  (+)      1,210,000.00  =     2,298,000.00
  Gyro (Standard):                 4.0 x 300,000                            (+)      1,200,000.00  =     3,498,000.00
  Cockpit (Standard):              200,000                                  (+)        200,000.00  =     3,698,000.00
  Life Support:                    50,000                                   (+)         50,000.00  =     3,748,000.00
  Sensors:                         55 x 2,000                               (+)        110,000.00  =     3,858,000.00
  Heat Sinks (Double):             10 x 6,000                               (+)         60,000.00  =     3,918,000.00
  Arm Actuators:                   55 x ((100 x 2) + (50 x 2) + (80 x 2))   (+)         25,300.00  =     3,943,300.00
  Leg Actuators:                   55 x ((150 x 2) + (80 x 2) + (120 x 2))  (+)         38,500.00  =     3,981,800.00
---------------------------------------------------------------------------------------------------------------------
Total Structural Cost:                                                                                   3,981,800.00
=====================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------
  C3 Slave                         250,000                                             250,000.00                    
  Flamer                           7,500                                    (+)          7,500.00  =       257,500.00
  Flamer                           7,500                                    (+)          7,500.00  =       265,000.00
  Flamer                           7,500                                    (+)          7,500.00  =       272,500.00
  Flamer                           7,500                                    (+)          7,500.00  =       280,000.00
  Flamer                           7,500                                    (+)          7,500.00  =       287,500.00
  Flamer                           7,500                                    (+)          7,500.00  =       295,000.00
  Small Laser                      11,250                                   (+)         11,250.00  =       306,250.00
  Small Laser                      11,250                                   (+)         11,250.00  =       317,500.00
  Small Laser                      11,250                                   (+)         11,250.00  =       328,750.00
---------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost                                                                           328,750.00
=====================================================================================================================
BattleMech Cost
---------------------------------------------------------------------------------------------------------------------
  Structural Cost:                                                                   3,981,800.00                    
  Weapons and Equipment Cost:                                               (+)        328,750.00  =     4,310,550.00
  BattleMech Cost Multiplier:      1 + (55 / 100)                           (*)              1.55  =     6,681,352.50
---------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost                                                                                    6,681,353.00
 |