Cost Breakdown
Name/Model: H-1
Technology: Inner Sphere (Mixed)
Tonnage: 80
Configuration: Tracked Combat Vehicle
=========================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (268 pts) 14.0 x 20,000 280,000.00
Internal Structure (Standard) 8.0 x 10,000 (+) 80,000.00 = 360,000.00
Control Components 4 x 10,000 (+) 40,000.00 = 400,000.00
Engine (XL) (20,000 x 240 x 80) / 75 (+) 5,120,000.00 = 5,520,000.00
Heat Sinks (Single) 20 x 2,000 (+) 40,000.00 = 5,560,000.00
Turret 2 x 5,000 (+) 10,000.00 = 5,570,000.00
---------------------------------------------------------------------------------------------------------
Total Structural Cost 5,570,000.00
=========================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------
Plasma Rifle 260,000 260,000.00
Plasma Rifle 260,000 (+) 260,000.00 = 520,000.00
Plasma Rifle 260,000 (+) 260,000.00 = 780,000.00
Plasma Rifle (Ammo 10) [Empty Bin] 0 (+) 0.00 = 780,000.00
Plasma Rifle (Ammo 10) [Empty Bin] 0 (+) 0.00 = 780,000.00
Plasma Rifle (Ammo 10) [Empty Bin] 0 (+) 0.00 = 780,000.00
Plasma Rifle (Ammo 10) [Empty Bin] 0 (+) 0.00 = 780,000.00
Supercharger (C) 240 x 10,000 (+) 2,400,000.00 = 3,180,000.00
---------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 3,180,000.00
=========================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------
Structural Cost 5,570,000.00
Weapons and Equipment Cost (+) 3,180,000.00 = 8,750,000.00
Combat Vehicle Cost Multiplier 1 + (80 / 100) (*) 1.8 = 15,750,000.00
---------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 15,750,000.00
|