Cost Breakdown
Name/Model: Hive HV-1
Technology: Clan
Tonnage: 50
Configuration: Hover Combat Vehicle
==========================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (215 pts) 11.5 x 20,000 230,000.00
Internal Structure (Standard) 5.0 x 10,000 (+) 50,000.00 = 280,000.00
Control Components 2.5 x 10,000 (+) 25,000.00 = 305,000.00
Lift/Dive Equipment 5 x 20,000 (+) 100,000.00 = 405,000.00
Engine (Fusion) (5,000 x 165 x 50) / 75 (+) 550,000.00 = 955,000.00
Heat Sinks (Single) 2 x 2,000 (+) 4,000.00 = 959,000.00
Turret 1 x 5,000 (+) 5,000.00 = 964,000.00
----------------------------------------------------------------------------------------------------------
Total Structural Cost 964,000.00
==========================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------
AP Gauss Rifle 10,000 10,000.00
AP Gauss Rifle 10,000 (+) 10,000.00 = 20,000.00
AP Gauss Rifle 10,000 (+) 10,000.00 = 30,000.00
AP Gauss Rifle 10,000 (+) 10,000.00 = 40,000.00
AP Gauss Rifle (Ammo 40) [Empty Bin] 0 (+) 0.00 = 40,000.00
AP Gauss Rifle (Ammo 40) [Empty Bin] 0 (+) 0.00 = 40,000.00
CASE 5 x 50,000 (+) 250,000.00 = 290,000.00
ER Large Laser 200,000 (+) 200,000.00 = 490,000.00
LRM 5 30,000 (+) 30,000.00 = 520,000.00
LRM 5 30,000 (+) 30,000.00 = 550,000.00
LRM 5 (Ammo 24) [Empty Bin] 0 (+) 0.00 = 550,000.00
LRM 5 (Ammo 24) [Empty Bin] 0 (+) 0.00 = 550,000.00
LRM 5 (Ammo 24) [Narc] [Empty Bin] 0 (+) 0.00 = 550,000.00
----------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 550,000.00
==========================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------
Structural Cost 964,000.00
Weapons and Equipment Cost (+) 550,000.00 = 1,514,000.00
Combat Vehicle Cost Multiplier 1 + (50 / 50) (*) 2 = 3,028,000.00
----------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 3,028,000.00
|