Cost Breakdown
Name/Model: Vedette Medium Tank (Cell)
Technology: Inner Sphere
Tonnage: 50
Configuration: Tracked Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Standard) (96 pts) 6.0 x 10,000 60,000.00
Internal Structure (Standard) 5.0 x 10,000 (+) 50,000.00 = 110,000.00
Control Components 2.5 x 10,000 (+) 25,000.00 = 135,000.00
Engine (Fuel Cell) (3,500 x 250 x 50) / 75 (+) 583,333.33 = 718,333.33
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 720,333.33
Turret 1.5 x 5,000 (+) 7,500.00 = 727,833.33
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 727,833.33
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
C3 Slave 250,000 (+) 250,000.00 = 350,000.00
CASE 50,000 (+) 50,000.00 = 400,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 800,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 800,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 800,000.00
Machine Gun 5,000 (+) 5,000.00 = 805,000.00
Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 805,000.00
SRM 2 10,000 (+) 10,000.00 = 815,000.00
SRM 2 10,000 (+) 10,000.00 = 825,000.00
SRM 2 (Ammo 50) [Empty Bin] 0 (+) 0.00 = 825,000.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 825,000.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 727,833.33
Weapons and Equipment Cost (+) 825,000.00 = 1,552,833.33
Combat Vehicle Cost Multiplier 1 + (50 / 100) (*) 1.5 = 2,329,250.00
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 2,329,250.00
|