Cost Breakdown
Name/Model: Danai Support Vehicle (Arrow)
Technology: Inner Sphere
Tonnage: 45
Configuration: Wheeled Combat Vehicle
===================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------
Armor (Vehicular Stealth) (112 pts) 7.0 x 50,000 350,000.00
Internal Structure (Standard) 4.5 x 10,000 (+) 45,000.00 = 395,000.00
Control Components 2.5 x 10,000 (+) 25,000.00 = 420,000.00
Engine (Fusion) (5,000 x 160 x 45) / 75 (+) 480,000.00 = 900,000.00
Turret 0.5 x 5,000 (+) 2,500.00 = 902,500.00
-------------------------------------------------------------------------------------------------------------------
Total Structural Cost 902,500.00
===================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------
Arrow IV System 450,000 450,000.00
Arrow IV System (Ammo 5) [Homing] [Empty Bin] 0 (+) 0.00 = 450,000.00
Arrow IV System (Ammo 5) [Homing] [Empty Bin] 0 (+) 0.00 = 450,000.00
Guardian ECM Suite 200,000 (+) 200,000.00 = 650,000.00
MagShot Gauss Rifle 8,500 (+) 8,500.00 = 658,500.00
MagShot Gauss Rifle 8,500 (+) 8,500.00 = 667,000.00
MagShot Gauss Rifle 8,500 (+) 8,500.00 = 675,500.00
MagShot Gauss Rifle 8,500 (+) 8,500.00 = 684,000.00
MagShot Gauss Rifle (Ammo 50) [Empty Bin] 0 (+) 0.00 = 684,000.00
-------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 684,000.00
===================================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------------------
Structural Cost 902,500.00
Weapons and Equipment Cost (+) 684,000.00 = 1,586,500.00
Combat Vehicle Cost Multiplier 1 + (45 / 200) (*) 1.225 = 1,943,462.50
-------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 1,943,463.00
|