Cost Breakdown
Name/Model: Med-Trailer
Technology: Inner Sphere
Tonnage: 50
Configuration: Wheeled Combat Vehicle
========================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------
Armor (Standard) (215 pts) 13.5 x 10,000 135,000.00
Internal Structure (Standard) 5.0 x 10,000 (+) 50,000.00 = 185,000.00
Control Components 2.5 x 10,000 (+) 25,000.00 = 210,000.00
Engine (None) (+) 0.00 = 210,000.00
--------------------------------------------------------------------------------------------------------
Total Structural Cost 210,000.00
========================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------
Bay, Infantry (Foot) (38 troopers) 6.5 x 15000 97,500.00
Cargo, Insulated (4 ton) 8 x 125 (+) 1,000.00 = 98,500.00
Cargo, Liquid (4 ton) 8 x 50 (+) 400.00 = 98,900.00
Cargo, Standard (5.5 ton) 11 x 0 (+) 0.00 = 98,900.00
Communications Equipment (1 ton) 1 x 10000 (+) 10,000.00 = 108,900.00
MASH Equipment (Core) 35,000 (+) 35,000.00 = 143,900.00
MASH Equipment (Theater) 10,000 (+) 10,000.00 = 153,900.00
MASH Equipment (Theater) 10,000 (+) 10,000.00 = 163,900.00
MASH Equipment (Theater) 10,000 (+) 10,000.00 = 173,900.00
MASH Equipment (Theater) 10,000 (+) 10,000.00 = 183,900.00
Paramedic Equipment 7,500 (+) 7,500.00 = 191,400.00
Paramedic Equipment 7,500 (+) 7,500.00 = 198,900.00
Trailer Hitch 0 (+) 0.00 = 198,900.00
Trailer Hitch 0 (+) 0.00 = 198,900.00
--------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 198,900.00
========================================================================================================
Combat Vehicle Cost
--------------------------------------------------------------------------------------------------------
Structural Cost 210,000.00
Weapons and Equipment Cost (+) 198,900.00 = 408,900.00
Combat Vehicle Cost Multiplier 1 + (50 / 200) (*) 1.25 = 511,125.00
--------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 511,125.00
|