Cost Breakdown
Name/Model: Arthopleura Combat Vehicle ACV-40-Flak Trailer
Technology: Inner Sphere
Tonnage: 40
Configuration: Wheeled Combat Vehicle
===============================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (179 pts) 10.0 x 20,000 200,000.00
Internal Structure (Standard) 4.0 x 10,000 (+) 40,000.00 = 240,000.00
Control Components 0 x 10,000 (+) 0.00 = 240,000.00
Engine (None) (+) 0.00 = 240,000.00
Turret 2 x 5,000 (+) 10,000.00 = 250,000.00
---------------------------------------------------------------------------------------------------------------
Total Structural Cost 250,000.00
===============================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
LB 5-X AC 250,000 (+) 250,000.00 = 300,000.00
LB 5-X AC 250,000 (+) 250,000.00 = 550,000.00
LB 5-X AC (Ammo 20) [Cluster] [Empty Bin] 0 (+) 0.00 = 550,000.00
LB 5-X AC (Ammo 20) [Cluster] [Empty Bin] 0 (+) 0.00 = 550,000.00
LB 5-X AC (Ammo 20) [Empty Bin] 0 (+) 0.00 = 550,000.00
LRM 5 30,000 (+) 30,000.00 = 580,000.00
LRM 5 (Ammo 24) [Empty Bin] 0 (+) 0.00 = 580,000.00
Machine Gun 5,000 (+) 5,000.00 = 585,000.00
Machine Gun 5,000 (+) 5,000.00 = 590,000.00
Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 590,000.00
Trailer Hitch 0 (+) 0.00 = 590,000.00
Trailer Hitch 0 (+) 0.00 = 590,000.00
---------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 590,000.00
===============================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------
Structural Cost 250,000.00
Weapons and Equipment Cost (+) 590,000.00 = 840,000.00
Combat Vehicle Cost Multiplier 1 + (40 / 200) (*) 1.2 = 1,008,000.00
---------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 1,008,000.00
|