Cost Breakdown
Name/Model: Behemoth Heavy Tank LBX
Technology: Inner Sphere
Tonnage: 100
Configuration: Tracked Combat Vehicle
=================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (386 pts) 19.5 x 25,000 487,500.00
Internal Structure (Standard) 10.0 x 10,000 (+) 100,000.00 = 587,500.00
Control Components 5 x 10,000 (+) 50,000.00 = 637,500.00
Engine (Fusion) (5,000 x 200 x 100) / 75 (+) 1,333,333.33 = 1,970,833.33
Turret 4.5 x 5,000 (+) 22,500.00 = 1,993,333.33
-----------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,993,333.33
=================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------
LB 10-X AC 400,000 400,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 800,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 1,200,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,200,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,200,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,200,000.00
LRM 15 (Ammo 8) [Empty Bin] 0 (+) 0.00 = 1,200,000.00
LRM 15 w/ Artemis IV FCS 175,000 + 100,000 (+) 275,000.00 = 1,475,000.00
Medium Laser 40,000 (+) 40,000.00 = 1,515,000.00
Medium Laser 40,000 (+) 40,000.00 = 1,555,000.00
Medium Laser 40,000 (+) 40,000.00 = 1,595,000.00
-----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,595,000.00
=================================================================================================================
Combat Vehicle Cost
-----------------------------------------------------------------------------------------------------------------
Structural Cost 1,993,333.33
Weapons and Equipment Cost (+) 1,595,000.00 = 3,588,333.33
Combat Vehicle Cost Multiplier 1 + (100 / 100) (*) 2 = 7,176,666.67
-----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 7,176,667.00
|