Cost Breakdown
Name/Model: Patton Tank (Taurian)
Technology: Inner Sphere
Tonnage: 65
Configuration: Tracked Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (228 pts) 11.5 x 25,000 287,500.00
Internal Structure (Standard) 6.5 x 10,000 (+) 65,000.00 = 352,500.00
Control Components 3.5 x 10,000 (+) 35,000.00 = 387,500.00
Engine (Fusion) (5,000 x 260 x 65) / 75 (+) 1,126,666.67 = 1,514,166.67
Turret 1.5 x 5,000 (+) 7,500.00 = 1,521,666.67
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,521,666.67
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
ER Medium Laser 80,000 80,000.00
Flamer 7,500 (+) 7,500.00 = 87,500.00
LB 10-X AC 400,000 (+) 400,000.00 = 487,500.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 487,500.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 487,500.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 487,500.00
LRM 5 30,000 (+) 30,000.00 = 517,500.00
LRM 5 (Ammo 24) [Empty Bin] 0 (+) 0.00 = 517,500.00
Supercharger 260 x 10,000 (+) 2,600,000.00 = 3,117,500.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 3,117,500.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 1,521,666.67
Weapons and Equipment Cost (+) 3,117,500.00 = 4,639,166.67
Combat Vehicle Cost Multiplier 1 + (65 / 100) (*) 1.65 = 7,654,625.00
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 7,654,625.00
|