Cost Breakdown
Name/Model: SAM System (Objective Target)
Technology: Inner Sphere
Tonnage: 40
Configuration: Tracked Combat Vehicle
=============================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (44 pts) 2.5 x 20,000 50,000.00
Internal Structure (Standard) 4.0 x 10,000 (+) 40,000.00 = 90,000.00
Control Components 2 x 10,000 (+) 20,000.00 = 110,000.00
Engine (Internal Combustion) (1,250 x 80 x 40) / 75 (+) 53,333.33 = 163,333.33
Heat Sinks (Single) 10 x 2,000 (+) 20,000.00 = 183,333.33
Turret 1.5 x 5,000 (+) 7,500.00 = 190,833.33
-------------------------------------------------------------------------------------------------------------
Total Structural Cost 190,833.33
=============================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------
Light Machine Gun 5,000 5,000.00
Light Machine Gun 5,000 (+) 5,000.00 = 10,000.00
Light Machine Gun 5,000 (+) 5,000.00 = 15,000.00
Light Machine Gun 5,000 (+) 5,000.00 = 20,000.00
Light Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 20,000.00
Light Machine Gun Array Module 1,250 (+) 1,250.00 = 21,250.00
Thunderbolt 15 325,000 (+) 325,000.00 = 346,250.00
Thunderbolt 15 (Ammo 4) [Empty Bin] 0 (+) 0.00 = 346,250.00
-------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 346,250.00
=============================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------------
Structural Cost 190,833.33
Weapons and Equipment Cost (+) 346,250.00 = 537,083.33
Combat Vehicle Cost Multiplier 1 + (40 / 100) (*) 1.4 = 751,916.67
-------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 751,917.00
|