Cost Breakdown
Name/Model:         Black Knight BL-9-SUSANO-C
Technology:         Inner Sphere (Mixed)
Tonnage:            75
Configuration:      Biped FrankenMech
=============================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------------------
  Armor (Standard):                        (240 pts) 15.0 x 10,000                             150,000.00                    
  Internal Structure (Endo Steel):         75 x 1,600 x 1                           (+)        120,000.00  =       270,000.00
  Myomer (Standard):                       75 x 2,000                               (+)        150,000.00  =       420,000.00
  Engine (XXL):                            (100,000 x 300 x 75) / 75                (+)     30,000,000.00  =    30,420,000.00
  Gyro (Standard):                         3.0 x 300,000                            (+)        900,000.00  =    31,320,000.00
  Cockpit (Standard):                      200,000                                  (+)        200,000.00  =    31,520,000.00
  Life Support:                            50,000                                   (+)         50,000.00  =    31,570,000.00
  Sensors:                                 75 x 2,000                               (+)        150,000.00  =    31,720,000.00
  Heat Sinks (Double):                     18 x 6,000                               (+)        108,000.00  =    31,828,000.00
  Arm Actuators:                           75 x ((100 x 2) + (50 x 2) + (80 x 2))   (+)         34,500.00  =    31,862,500.00
  Leg Actuators:                           75 x ((150 x 2) + (80 x 2) + (120 x 2))  (+)         52,500.00  =    31,915,000.00
-----------------------------------------------------------------------------------------------------------------------------
Total Structural Cost:                                                                                          31,915,000.00
=============================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------------------
  Coolant Pod                              50,000                                               50,000.00                    
  ER PPC (C)                               300,000                                  (+)        300,000.00  =       350,000.00
  Laser Anti-Missile System (C)            225,000                                  (+)        225,000.00  =       575,000.00
  Laser Anti-Missile System (C)            225,000                                  (+)        225,000.00  =       800,000.00
  PPC Capacitor (C)                        150,000                                  (+)        150,000.00  =       950,000.00
  Snub-Nose PPC                            300,000                                  (+)        300,000.00  =     1,250,000.00
  Snub-Nose PPC                            300,000                                  (+)        300,000.00  =     1,550,000.00
  Snub-Nose PPC                            300,000                                  (+)        300,000.00  =     1,850,000.00
  SRM 4 (C)                                60,000                                   (+)         60,000.00  =     1,910,000.00
  SRM 4 (C)                                60,000                                   (+)         60,000.00  =     1,970,000.00
  SRM 4 (Ammo 25) [Smoke] [Empty Bin] (C)  0                                        (+)              0.00  =     1,970,000.00
  Sword                                    4 x 10,000                               (+)         40,000.00  =     2,010,000.00
-----------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost                                                                                 2,010,000.00
=============================================================================================================================
BattleMech Cost
-----------------------------------------------------------------------------------------------------------------------------
  Structural Cost:                                                                          31,915,000.00                    
  Weapons and Equipment Cost:                                                       (+)      2,010,000.00  =    33,925,000.00
  BattleMech Cost Multiplier:              1 + (75 / 100)                           (*)              1.75  =    59,368,750.00
-----------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost                                                                                           59,368,750.00
 
		 |