Cost Breakdown
Name/Model: Po Heavy Tank (Fuel Cell Armor)
Technology: Inner Sphere
Tonnage: 60
Configuration: Tracked Combat Vehicle
=================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (238 pts) 12.0 x 25,000 300,000.00
Internal Structure (Standard) 6.0 x 10,000 (+) 60,000.00 = 360,000.00
Control Components 3 x 10,000 (+) 30,000.00 = 390,000.00
Engine (Fuel Cell) (3,500 x 240 x 60) / 75 (+) 672,000.00 = 1,062,000.00
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 1,064,000.00
Turret 1.5 x 5,000 (+) 7,500.00 = 1,071,500.00
-----------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,071,500.00
=================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
Guardian ECM Suite 200,000 (+) 200,000.00 = 250,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 650,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 650,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 650,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 650,000.00
Machine Gun 5,000 (+) 5,000.00 = 655,000.00
Machine Gun 5,000 (+) 5,000.00 = 660,000.00
Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 660,000.00
MML 5 75,000 (+) 75,000.00 = 735,000.00
MML 5 (Ammo 20) [SRM / Inferno] [Empty Bin] 0 (+) 0.00 = 735,000.00
MML 5 (Ammo 20) [SRM] [Empty Bin] 0 (+) 0.00 = 735,000.00
MML 5 (Ammo 24) [LRM / Smoke] [Empty Bin] 0 (+) 0.00 = 735,000.00
-----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 735,000.00
=================================================================================================================
Combat Vehicle Cost
-----------------------------------------------------------------------------------------------------------------
Structural Cost 1,071,500.00
Weapons and Equipment Cost (+) 735,000.00 = 1,806,500.00
Combat Vehicle Cost Multiplier 1 + (60 / 100) (*) 1.6 = 2,890,400.00
-----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 2,890,400.00
|