Cost Breakdown
Name/Model: Sturmfeur SF-SM-C
Technology: Inner Sphere
Tonnage: 85
Configuration: Tracked Combat Vehicle
===============================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------
Armor (Standard) (328 pts) 20.5 x 10,000 205,000.00
Internal Structure (Standard) 8.5 x 10,000 (+) 85,000.00 = 290,000.00
Control Components 4.5 x 10,000 (+) 45,000.00 = 335,000.00
Engine (Fuel Cell) (3,500 x 255 x 85) / 75 (+) 1,011,500.00 = 1,346,500.00
Heat Sinks (Single) 2 x 2,000 (+) 4,000.00 = 1,350,500.00
Turret 1.5 x 5,000 (+) 7,500.00 = 1,358,000.00
Power Amplifiers 0.5 x 20,000 (+) 10,000.00 = 1,368,000.00
---------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,368,000.00
===============================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
CASE 50,000 (+) 50,000.00 = 150,000.00
Drone Carrier Control System (2 drones) 3 x 10,000 (+) 30,000.00 = 180,000.00
Improved C3 Computer 750,000 (+) 750,000.00 = 930,000.00
LRM 20 250,000 (+) 250,000.00 = 1,180,000.00
LRM 20 250,000 (+) 250,000.00 = 1,430,000.00
LRM 20 (Ammo 6) [Empty Bin] 0 (+) 0.00 = 1,430,000.00
LRM 20 (Ammo 6) [Empty Bin] 0 (+) 0.00 = 1,430,000.00
LRM 20 (Ammo 6) [Empty Bin] 0 (+) 0.00 = 1,430,000.00
LRM 20 (Ammo 6) [Empty Bin] 0 (+) 0.00 = 1,430,000.00
Small Pulse Laser 16,000 (+) 16,000.00 = 1,446,000.00
---------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,446,000.00
===============================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------
Structural Cost 1,368,000.00
Weapons and Equipment Cost (+) 1,446,000.00 = 2,814,000.00
Combat Vehicle Cost Multiplier 1 + (85 / 100) (*) 1.85 = 5,205,900.00
---------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 5,205,900.00
|