Cost Breakdown
Name/Model: Chaffee M24/67
Technology: Inner Sphere
Tonnage: 20
Configuration: Tracked Combat Vehicle
===============================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------
Armor (Standard) (80 pts) 5.0 x 10,000 50,000.00
Internal Structure (Standard) 2.0 x 10,000 (+) 20,000.00 = 70,000.00
Control Components 1 x 10,000 (+) 10,000.00 = 80,000.00
Engine (Fuel Cell) (3,500 x 140 x 20) / 75 (+) 130,666.67 = 210,666.67
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 212,666.67
Turret 0.5 x 5,000 (+) 2,500.00 = 215,166.67
---------------------------------------------------------------------------------------------------------------
Total Structural Cost 215,166.67
===============================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------
Machine Gun 5,000 5,000.00
Machine Gun 5,000 (+) 5,000.00 = 10,000.00
Machine Gun 5,000 (+) 5,000.00 = 15,000.00
Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 15,000.00
MagShot Gauss Rifle 8,500 (+) 8,500.00 = 23,500.00
MagShot Gauss Rifle (Ammo 50) [Empty Bin] 0 (+) 0.00 = 23,500.00
Supercharger 140 x 10,000 (+) 1,400,000.00 = 1,423,500.00
TAG 50,000 (+) 50,000.00 = 1,473,500.00
---------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,473,500.00
===============================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------
Structural Cost 215,166.67
Weapons and Equipment Cost (+) 1,473,500.00 = 1,688,666.67
Combat Vehicle Cost Multiplier 1 + (20 / 100) (*) 1.2 = 2,026,400.00
---------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 2,026,400.00
|