Cost Breakdown
Name/Model: Slammer UP M2A4
Technology: Inner Sphere
Tonnage: 70
Configuration: Tracked Combat Vehicle
=================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------
Armor (Reactive) (240 pts) 15.0 x 30,000 450,000.00
Internal Structure (Standard) 7.0 x 10,000 (+) 70,000.00 = 520,000.00
Control Components 3.5 x 10,000 (+) 35,000.00 = 555,000.00
Engine (Light Fusion) (15,000 x 280 x 70) / 75 (+) 3,920,000.00 = 4,475,000.00
Turret 1.5 x 5,000 (+) 7,500.00 = 4,482,500.00
-----------------------------------------------------------------------------------------------------------------
Total Structural Cost 4,482,500.00
=================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------
Bay, Infantry (Foot) (20 troopers) 3 x 15000 45,000.00
CASE 50,000 (+) 50,000.00 = 95,000.00
Chaff Pod 2,000 (+) 2,000.00 = 97,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 497,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 497,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 497,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 497,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 497,000.00
Light Machine Gun 5,000 (+) 5,000.00 = 502,000.00
Light Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 502,000.00
Machine Gun 5,000 (+) 5,000.00 = 507,000.00
Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 507,000.00
Targeting Computer 3 x 10,000 (+) 30,000.00 = 537,000.00
-----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 537,000.00
=================================================================================================================
Combat Vehicle Cost
-----------------------------------------------------------------------------------------------------------------
Structural Cost 4,482,500.00
Weapons and Equipment Cost (+) 537,000.00 = 5,019,500.00
Combat Vehicle Cost Multiplier 1 + (70 / 100) (*) 1.7 = 8,533,150.00
-----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 8,533,150.00
|