Cost Breakdown
Name/Model: The Trash CAN
Technology: Inner Sphere (Mixed)
Tonnage: 50
Configuration: WiGE Combat Vehicle
=========================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------
Armor (Standard) (0 pts) 0.0 x 10,000 0.00
Internal Structure (Standard) 5.0 x 10,000 (+) 50,000.00 = 50,000.00
Control Components 2.5 x 10,000 (+) 25,000.00 = 75,000.00
Lift/Dive Equipment 5 x 20,000 (+) 100,000.00 = 175,000.00
Engine (XXL) (100,000 x 310 x 50) / 75 (+) 20,666,666.67 = 20,841,666.67
Heat Sinks (Single) 14 x 2,000 (+) 28,000.00 = 20,869,666.67
---------------------------------------------------------------------------------------------------------
Total Structural Cost 20,869,666.67
=========================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------
ER Small Laser (C) 11,250 11,250.00
ER Small Laser 11,250 (+) 11,250.00 = 22,500.00
ER Small Laser (Prototype) (C) 11,250 (+) 11,250.00 = 33,750.00
ER Small Pulse Laser (C) 30,000 (+) 30,000.00 = 63,750.00
Heavy Small Laser (C) 20,000 (+) 20,000.00 = 83,750.00
Improved Heavy Small Laser (C) 30,000 (+) 30,000.00 = 113,750.00
Small Laser (Prototype) 11,250 (+) 11,250.00 = 125,000.00
Small Pulse Laser (C) 16,000 (+) 16,000.00 = 141,000.00
Small Pulse Laser 16,000 (+) 16,000.00 = 157,000.00
Small VSP Laser 60,000 (+) 60,000.00 = 217,000.00
Vehicular Jump Jets 50 x (9 x 9) x 200 (+) 810,000.00 = 1,027,000.00
---------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,027,000.00
=========================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------
Structural Cost 20,869,666.67
Weapons and Equipment Cost (+) 1,027,000.00 = 21,896,666.67
Combat Vehicle Cost Multiplier 1 + (50 / 25) (*) 3 = 65,690,000.00
---------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 65,690,000.00
|