Cost Breakdown
Name/Model: Pike Support Vehicle Sniper LBX
Technology: Clan (Mixed)
Tonnage: 60
Configuration: Tracked Combat Vehicle
========================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (168 pts) 8.5 x 25,000 212,500.00
Internal Structure (Standard) 6.0 x 10,000 (+) 60,000.00 = 272,500.00
Control Components 3 x 10,000 (+) 30,000.00 = 302,500.00
Engine (XL) (20,000 x 180 x 60) / 75 (+) 2,880,000.00 = 3,182,500.00
Turret 3 x 5,000 (+) 15,000.00 = 3,197,500.00
--------------------------------------------------------------------------------------------------------
Total Structural Cost 3,197,500.00
========================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------
CASE 1 x 50,000 50,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 200,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 350,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 500,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 650,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 800,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 950,000.00
LB 2-X AC (Ammo 45) [Empty Bin] 0 (+) 0.00 = 950,000.00
LB 2-X AC (Ammo 45) [Empty Bin] 0 (+) 0.00 = 950,000.00
LB 2-X AC (Ammo 45) [Empty Bin] 0 (+) 0.00 = 950,000.00
LB 2-X AC (Ammo 45) [Empty Bin] 0 (+) 0.00 = 950,000.00
--------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 950,000.00
========================================================================================================
Combat Vehicle Cost
--------------------------------------------------------------------------------------------------------
Structural Cost 3,197,500.00
Weapons and Equipment Cost (+) 950,000.00 = 4,147,500.00
Combat Vehicle Cost Multiplier 1 + (60 / 100) (*) 1.6 = 6,636,000.00
--------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 6,636,000.00
|