Cost Breakdown
Name/Model:         Demolisher Heavy Tank (Arrow IV)
Technology:         Inner Sphere
Tonnage:            80
Configuration:      Tracked Combat Vehicle
=======================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------------
  Armor (Ferro-Fibrous)                              (152 pts) 8.5 x 20,000              170,000.00                    
  Internal Structure (Standard)                      8.0 x 10,000             (+)         80,000.00  =       250,000.00
  Control Components                                 4 x 10,000               (+)         40,000.00  =       290,000.00
  Engine (Fusion)                                    (5,000 x 240 x 80) / 75  (+)      1,280,000.00  =     1,570,000.00
  Turret                                             3 x 5,000                (+)         15,000.00  =     1,585,000.00
-----------------------------------------------------------------------------------------------------------------------
Total Structural Cost                                                                                      1,585,000.00
=======================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------------
  Arrow IV System                                    450,000                             450,000.00                    
  Arrow IV System                                    450,000                  (+)        450,000.00  =       900,000.00
  Arrow IV System (Ammo 5) [Homing] [Empty Bin]      0                        (+)              0.00  =       900,000.00
  Arrow IV System (Ammo 5) [Homing] [Empty Bin]      0                        (+)              0.00  =       900,000.00
  Arrow IV System (Ammo 5) [Homing] [Empty Bin]      0                        (+)              0.00  =       900,000.00
  Arrow IV System (Ammo 5) [Non-Homing] [Empty Bin]  0                        (+)              0.00  =       900,000.00
  Arrow IV System (Ammo 5) [Non-Homing] [Empty Bin]  0                        (+)              0.00  =       900,000.00
  Arrow IV System (Ammo 5) [Non-Homing] [Empty Bin]  0                        (+)              0.00  =       900,000.00
  Arrow IV System (Ammo 5) [Non-Homing] [Empty Bin]  0                        (+)              0.00  =       900,000.00
  Medium Laser                                       40,000                   (+)         40,000.00  =       940,000.00
  Medium Laser                                       40,000                   (+)         40,000.00  =       980,000.00
-----------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost                                                                             980,000.00
=======================================================================================================================
Combat Vehicle Cost
-----------------------------------------------------------------------------------------------------------------------
  Structural Cost                                                                      1,585,000.00                    
  Weapons and Equipment Cost                                                  (+)        980,000.00  =     2,565,000.00
  Combat Vehicle Cost Multiplier                     1 + (80 / 100)           (*)               1.8  =     4,617,000.00
-----------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost                                                                                  4,617,000.00
 
		 |