Cost Breakdown
Name/Model: C - Rhino Heavy Support Tank
Technology: Inner Sphere (Mixed)
Tonnage: 80
Configuration: Tracked Combat Vehicle
========================================================================================================================
Structural Cost
------------------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (248 pts) 12.5 x 25,000 312,500.00
Internal Structure (Standard) 8.0 x 10,000 (+) 80,000.00 = 392,500.00
Control Components 4 x 10,000 (+) 40,000.00 = 432,500.00
Engine (XL) (20,000 x 240 x 80) / 75 (+) 5,120,000.00 = 5,552,500.00
Heat Sinks (Single) 5 x 2,000 (+) 10,000.00 = 5,562,500.00
Turret 2 x 5,000 (+) 10,000.00 = 5,572,500.00
------------------------------------------------------------------------------------------------------------------------
Total Structural Cost 5,572,500.00
========================================================================================================================
Weapons and Equipment Cost
------------------------------------------------------------------------------------------------------------------------
Arrow IV System (C) 450,000 450,000.00
Arrow IV System (Ammo 5) [Homing] [Empty Bin] (C) 0 (+) 0.00 = 450,000.00
Arrow IV System (Ammo 5) [Homing] [Empty Bin] (C) 0 (+) 0.00 = 450,000.00
Arrow IV System (Ammo 5) [Homing] [Empty Bin] (C) 0 (+) 0.00 = 450,000.00
Arrow IV System (Ammo 5) [Homing] [Empty Bin] (C) 0 (+) 0.00 = 450,000.00
CASE 50,000 (+) 50,000.00 = 500,000.00
ER PPC (C) 300,000 (+) 300,000.00 = 800,000.00
LB 5-X AC (C) 250,000 (+) 250,000.00 = 1,050,000.00
LB 5-X AC (C) 250,000 (+) 250,000.00 = 1,300,000.00
LB 5-X AC (Ammo 20) [Cluster] [Empty Bin] (C) 0 (+) 0.00 = 1,300,000.00
LB 5-X AC (Ammo 20) [Cluster] [Empty Bin] (C) 0 (+) 0.00 = 1,300,000.00
LB 5-X AC (Ammo 20) [Empty Bin] (C) 0 (+) 0.00 = 1,300,000.00
------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,300,000.00
========================================================================================================================
Combat Vehicle Cost
------------------------------------------------------------------------------------------------------------------------
Structural Cost 5,572,500.00
Weapons and Equipment Cost (+) 1,300,000.00 = 6,872,500.00
Combat Vehicle Cost Multiplier 1 + (80 / 100) (*) 1.8 = 12,370,500.00
------------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 12,370,500.00
|