Cost Breakdown
Name/Model: C - Schrek
Technology: Inner Sphere (Mixed)
Tonnage: 80
Configuration: Tracked Combat Vehicle
======================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (228 pts) 11.5 x 25,000 287,500.00
Internal Structure (Standard) 8.0 x 10,000 (+) 80,000.00 = 367,500.00
Control Components 4 x 10,000 (+) 40,000.00 = 407,500.00
Engine (XXL) (100,000 x 320 x 80) / 75 (+) 34,133,333.33 = 34,540,833.33
Turret 3 x 5,000 (+) 15,000.00 = 34,555,833.33
----------------------------------------------------------------------------------------------------------------------
Total Structural Cost 34,555,833.33
======================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------------
CASE (C) 1 x 50,000 50,000.00
LB 10-X AC (C) 400,000 (+) 400,000.00 = 450,000.00
LB 10-X AC (C) 400,000 (+) 400,000.00 = 850,000.00
LB 10-X AC (C) 400,000 (+) 400,000.00 = 1,250,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] (C) 0 (+) 0.00 = 1,250,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] (C) 0 (+) 0.00 = 1,250,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] (C) 0 (+) 0.00 = 1,250,000.00
LB 10-X AC (Ammo 10) [Empty Bin] (C) 0 (+) 0.00 = 1,250,000.00
LB 10-X AC (Ammo 10) [Empty Bin] (C) 0 (+) 0.00 = 1,250,000.00
LB 10-X AC (Ammo 10) [Empty Bin] (C) 0 (+) 0.00 = 1,250,000.00
Targeting Computer (C) 6 x 10,000 (+) 60,000.00 = 1,310,000.00
----------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,310,000.00
======================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------------
Structural Cost 34,555,833.33
Weapons and Equipment Cost (+) 1,310,000.00 = 35,865,833.33
Combat Vehicle Cost Multiplier 1 + (80 / 100) (*) 1.8 = 64,558,500.00
----------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 64,558,500.00
|