Cost Breakdown
Name/Model: C - Oro
Technology: Clan (Mixed)
Tonnage: 60
Configuration: Tracked Combat Vehicle
==================================================================================================================
Structural Cost
------------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (218 pts) 11.0 x 25,000 275,000.00
Internal Structure (Standard) 6.0 x 10,000 (+) 60,000.00 = 335,000.00
Control Components 3 x 10,000 (+) 30,000.00 = 365,000.00
Engine (XL) (20,000 x 240 x 60) / 75 (+) 3,840,000.00 = 4,205,000.00
Heat Sinks (Single) 2 x 2,000 (+) 4,000.00 = 4,209,000.00
Turret 2 x 5,000 (+) 10,000.00 = 4,219,000.00
------------------------------------------------------------------------------------------------------------------
Total Structural Cost 4,219,000.00
==================================================================================================================
Weapons and Equipment Cost
------------------------------------------------------------------------------------------------------------------
AP Gauss Rifle 10,000 10,000.00
AP Gauss Rifle 10,000 (+) 10,000.00 = 20,000.00
AP Gauss Rifle (Ammo 40) [Empty Bin] 0 (+) 0.00 = 20,000.00
CASE 1 x 50,000 (+) 50,000.00 = 70,000.00
Hyper-Assault Gauss 30 500,000 (+) 500,000.00 = 570,000.00
Hyper-Assault Gauss 30 (Ammo 4) [Empty Bin] 0 (+) 0.00 = 570,000.00
Hyper-Assault Gauss 30 (Ammo 4) [Empty Bin] 0 (+) 0.00 = 570,000.00
Hyper-Assault Gauss 30 (Ammo 4) [Empty Bin] 0 (+) 0.00 = 570,000.00
Hyper-Assault Gauss 30 (Ammo 4) [Empty Bin] 0 (+) 0.00 = 570,000.00
Hyper-Assault Gauss 30 (Ammo 4) [Empty Bin] 0 (+) 0.00 = 570,000.00
Hyper-Assault Gauss 30 (Ammo 4) [Empty Bin] 0 (+) 0.00 = 570,000.00
Medium Pulse Laser 60,000 (+) 60,000.00 = 630,000.00
Medium Pulse Laser 60,000 (+) 60,000.00 = 690,000.00
Medium Pulse Laser 60,000 (+) 60,000.00 = 750,000.00
------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 750,000.00
==================================================================================================================
Combat Vehicle Cost
------------------------------------------------------------------------------------------------------------------
Structural Cost 4,219,000.00
Weapons and Equipment Cost (+) 750,000.00 = 4,969,000.00
Combat Vehicle Cost Multiplier 1 + (60 / 100) (*) 1.6 = 7,950,400.00
------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 7,950,400.00
|