Cost Breakdown
Name/Model: Estevez Main Battle Tank
Technology: Inner Sphere
Tonnage: 80
Configuration: Tracked Combat Vehicle
========================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------
Armor (Standard) (128 pts) 8.0 x 10,000 80,000.00
Internal Structure (Standard) 8.0 x 10,000 (+) 80,000.00 = 160,000.00
Control Components 4 x 10,000 (+) 40,000.00 = 200,000.00
Engine (Internal Combustion) (1,250 x 240 x 80) / 75 (+) 320,000.00 = 520,000.00
Turret 1 x 5,000 (+) 5,000.00 = 525,000.00
--------------------------------------------------------------------------------------------------------
Total Structural Cost 525,000.00
========================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------
Heavy Rifle 90,000 90,000.00
Heavy Rifle (Ammo 6) [Empty Bin] 0 (+) 0.00 = 90,000.00
Heavy Rifle (Ammo 6) [Empty Bin] 0 (+) 0.00 = 90,000.00
Heavy Rifle (Ammo 6) [Empty Bin] 0 (+) 0.00 = 90,000.00
Heavy Rifle (Ammo 6) [Empty Bin] 0 (+) 0.00 = 90,000.00
Heavy Rifle (Ammo 6) [Empty Bin] 0 (+) 0.00 = 90,000.00
Heavy Rifle (Ammo 6) [Empty Bin] 0 (+) 0.00 = 90,000.00
Heavy Rifle (Ammo 6) [Empty Bin] 0 (+) 0.00 = 90,000.00
Machine Gun 5,000 (+) 5,000.00 = 95,000.00
Machine Gun 5,000 (+) 5,000.00 = 100,000.00
Machine Gun (Ammo 200) [Empty Bin] 0 (+) 0.00 = 100,000.00
Machine Gun (Ammo 200) [Empty Bin] 0 (+) 0.00 = 100,000.00
Vehicular Grenade Launcher 10,000 (+) 10,000.00 = 110,000.00
Vehicular Grenade Launcher 10,000 (+) 10,000.00 = 120,000.00
--------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 120,000.00
========================================================================================================
Combat Vehicle Cost
--------------------------------------------------------------------------------------------------------
Structural Cost 525,000.00
Weapons and Equipment Cost (+) 120,000.00 = 645,000.00
Combat Vehicle Cost Multiplier 1 + (80 / 100) (*) 1.8 = 1,161,000.00
--------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 1,161,000.00
|