Cost Breakdown
Name/Model: Bulldog Medium Tank (Plasma)
Technology: Inner Sphere
Tonnage: 60
Configuration: Tracked Combat Vehicle
=============================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (168 pts) 8.5 x 25,000 212,500.00
Internal Structure (Standard) 6.0 x 10,000 (+) 60,000.00 = 272,500.00
Control Components 3 x 10,000 (+) 30,000.00 = 302,500.00
Engine (Fuel Cell) (3,500 x 240 x 60) / 75 (+) 672,000.00 = 974,500.00
Heat Sinks (Single) 10 x 2,000 (+) 20,000.00 = 994,500.00
Turret 1.5 x 5,000 (+) 7,500.00 = 1,002,000.00
Power Amplifiers 1 x 20,000 (+) 20,000.00 = 1,022,000.00
-------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,022,000.00
=============================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
Heavy Machine Gun 7,500 (+) 7,500.00 = 57,500.00
Heavy Machine Gun (Ammo 50) [Empty Bin] 0 (+) 0.00 = 57,500.00
Plasma Rifle 260,000 (+) 260,000.00 = 317,500.00
Plasma Rifle (Ammo 10) [Empty Bin] 0 (+) 0.00 = 317,500.00
Plasma Rifle (Ammo 10) [Empty Bin] 0 (+) 0.00 = 317,500.00
Streak SRM 4 90,000 (+) 90,000.00 = 407,500.00
Streak SRM 4 90,000 (+) 90,000.00 = 497,500.00
Streak SRM 4 (Ammo 25) [Empty Bin] 0 (+) 0.00 = 497,500.00
-------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 497,500.00
=============================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------------
Structural Cost 1,022,000.00
Weapons and Equipment Cost (+) 497,500.00 = 1,519,500.00
Combat Vehicle Cost Multiplier 1 + (60 / 100) (*) 1.6 = 2,431,200.00
-------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 2,431,200.00
|