Cost Breakdown
Name/Model: Bulldog Medium Tank (LB-X)
Technology: Inner Sphere
Tonnage: 60
Configuration: Tracked Combat Vehicle
========================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (168 pts) 8.5 x 25,000 212,500.00
Internal Structure (Standard) 6.0 x 10,000 (+) 60,000.00 = 272,500.00
Control Components 3 x 10,000 (+) 30,000.00 = 302,500.00
Engine (Fuel Cell) (3,500 x 240 x 60) / 75 (+) 672,000.00 = 974,500.00
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 976,500.00
Turret 2 x 5,000 (+) 10,000.00 = 986,500.00
--------------------------------------------------------------------------------------------------------
Total Structural Cost 986,500.00
========================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
LB 5-X AC 250,000 (+) 250,000.00 = 300,000.00
LB 5-X AC 250,000 (+) 250,000.00 = 550,000.00
LB 5-X AC (Ammo 20) [Empty Bin] 0 (+) 0.00 = 550,000.00
LB 5-X AC (Ammo 20) [Empty Bin] 0 (+) 0.00 = 550,000.00
Machine Gun 5,000 (+) 5,000.00 = 555,000.00
Machine Gun 5,000 (+) 5,000.00 = 560,000.00
Machine Gun (Ammo 200) [Empty Bin] 0 (+) 0.00 = 560,000.00
SRM 4 60,000 (+) 60,000.00 = 620,000.00
SRM 4 60,000 (+) 60,000.00 = 680,000.00
SRM 4 (Ammo 25) [Empty Bin] 0 (+) 0.00 = 680,000.00
SRM 4 (Ammo 25) [Empty Bin] 0 (+) 0.00 = 680,000.00
--------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 680,000.00
========================================================================================================
Combat Vehicle Cost
--------------------------------------------------------------------------------------------------------
Structural Cost 986,500.00
Weapons and Equipment Cost (+) 680,000.00 = 1,666,500.00
Combat Vehicle Cost Multiplier 1 + (60 / 100) (*) 1.6 = 2,666,400.00
--------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 2,666,400.00
|