Cost Breakdown
Name/Model: Von Luckner Heavy Tank VNL-S80 (SO) "Space Olympics"
Technology: Inner Sphere
Tonnage: 75
Configuration: Tracked Combat Vehicle
==============================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (188 pts) 10.5 x 20,000 210,000.00
Internal Structure (Standard) 7.5 x 10,000 (+) 75,000.00 = 285,000.00
Control Components 4 x 10,000 (+) 40,000.00 = 325,000.00
Engine (XL) (20,000 x 225 x 75) / 75 (+) 4,500,000.00 = 4,825,000.00
Heat Sinks (Single) 2 x 2,000 (+) 4,000.00 = 4,829,000.00
Turret 2.5 x 5,000 (+) 12,500.00 = 4,841,500.00
--------------------------------------------------------------------------------------------------------------
Total Structural Cost 4,841,500.00
==============================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------------
C3 Boosted Slave 500,000 500,000.00
CASE 50,000 (+) 50,000.00 = 550,000.00
Chaff Pod 2,000 (+) 2,000.00 = 552,000.00
ER Large Laser 200,000 (+) 200,000.00 = 752,000.00
HarJel 120,000 (+) 120,000.00 = 872,000.00
HarJel 120,000 (+) 120,000.00 = 992,000.00
Light Gauss Rifle 275,000 (+) 275,000.00 = 1,267,000.00
Light Gauss Rifle (Ammo 16) [Empty Bin] 0 (+) 0.00 = 1,267,000.00
MML 5 75,000 (+) 75,000.00 = 1,342,000.00
MML 5 75,000 (+) 75,000.00 = 1,417,000.00
MML 5 (Ammo 20) [SRM] [Empty Bin] 0 (+) 0.00 = 1,417,000.00
MML 5 (Ammo 20) [SRM] [Empty Bin] 0 (+) 0.00 = 1,417,000.00
MML 5 (Ammo 24) [LRM] [Empty Bin] 0 (+) 0.00 = 1,417,000.00
--------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,417,000.00
==============================================================================================================
Combat Vehicle Cost
--------------------------------------------------------------------------------------------------------------
Structural Cost 4,841,500.00
Weapons and Equipment Cost (+) 1,417,000.00 = 6,258,500.00
Combat Vehicle Cost Multiplier 1 + (75 / 100) (*) 1.75 = 10,952,375.00
Environmental Sealing 10,952,375.00 x 0.25 (+) 2,738,093.75 = 13,690,468.75
--------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 13,690,469.00
|