Cost Breakdown
Name/Model: Von Luckner Heavy Tank VNL-S80 (SO) "Space Olympics"
Technology: Inner Sphere
Tonnage: 75
Configuration: Tracked Combat Vehicle
==============================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (188 pts) 9.5 x 25,000 237,500.00
Internal Structure (Standard) 7.5 x 10,000 (+) 75,000.00 = 312,500.00
Control Components 4 x 10,000 (+) 40,000.00 = 352,500.00
Engine (XL) (20,000 x 225 x 75) / 75 (+) 4,500,000.00 = 4,852,500.00
Heat Sinks (Single) 5 x 2,000 (+) 10,000.00 = 4,862,500.00
Turret 2.5 x 5,000 (+) 12,500.00 = 4,875,000.00
--------------------------------------------------------------------------------------------------------------
Total Structural Cost 4,875,000.00
==============================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------------
C3 Boosted Slave 500,000 500,000.00
CASE 50,000 (+) 50,000.00 = 550,000.00
Chaff Pod 2,000 (+) 2,000.00 = 552,000.00
ER PPC 300,000 (+) 300,000.00 = 852,000.00
HarJel 120,000 (+) 120,000.00 = 972,000.00
HarJel 120,000 (+) 120,000.00 = 1,092,000.00
Light Gauss Rifle 275,000 (+) 275,000.00 = 1,367,000.00
Light Gauss Rifle (Ammo 16) [Empty Bin] 0 (+) 0.00 = 1,367,000.00
MML 3 45,000 (+) 45,000.00 = 1,412,000.00
MML 3 45,000 (+) 45,000.00 = 1,457,000.00
MML 3 (Ammo 33) [SRM] [Empty Bin] 0 (+) 0.00 = 1,457,000.00
MML 3 (Ammo 40) [LRM] [Empty Bin] 0 (+) 0.00 = 1,457,000.00
--------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,457,000.00
==============================================================================================================
Combat Vehicle Cost
--------------------------------------------------------------------------------------------------------------
Structural Cost 4,875,000.00
Weapons and Equipment Cost (+) 1,457,000.00 = 6,332,000.00
Combat Vehicle Cost Multiplier 1 + (75 / 100) (*) 1.75 = 11,081,000.00
Environmental Sealing 11,081,000.00 x 0.25 (+) 2,770,250.00 = 13,851,250.00
--------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 13,851,250.00
|