|                  Cost Breakdown
Name/Model:         Kong KNG-II1
Technology:         Inner Sphere (Mixed)
Tonnage:            50
Configuration:      Biped IndustrialMech
===============================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------------------
  Armor (Heavy Industrial):                  (168 pts) 10.5 x 10,000                             105,000.00                    
  Internal Structure (Primitive Industrial): 50 x 300 x 1                             (+)         15,000.00  =       120,000.00
  Myomer (Industrial Triple-Strength):       50 x 12,000                              (+)        600,000.00  =       720,000.00
  Engine (Primitive Fuel Cell):              (3,500 x 240 x 50) / 75                  (+)        560,000.00  =     1,280,000.00
  Gyro (Primitive):                          3.0 x 300,000                            (+)        900,000.00  =     2,180,000.00
  Cockpit (Industrial):                      100,000                                  (+)        100,000.00  =     2,280,000.00
  Life Support:                              50,000                                   (+)         50,000.00  =     2,330,000.00
  Sensors:                                   50 x 2,000                               (+)        100,000.00  =     2,430,000.00
  Heat Sinks (Single):                       3 x 2,000                                (+)          6,000.00  =     2,436,000.00
  Arm Actuators:                             50 x ((100 x 2) + (50 x 2) + (80 x 2))   (+)         23,000.00  =     2,459,000.00
  Leg Actuators:                             50 x ((150 x 2) + (80 x 2) + (120 x 2))  (+)         35,000.00  =     2,494,000.00
-------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost:                                                                                             2,494,000.00
===============================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------------------
  Ejection Seat                              25,000                                               25,000.00                    
  Light Rifle                                37,750                                   (+)         37,750.00  =        62,750.00
  Light Rifle                                37,750                                   (+)         37,750.00  =       100,500.00
  Light Rifle (Ammo 18) [Empty Bin]          0                                        (+)              0.00  =       100,500.00
-------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost                                                                                     100,500.00
===============================================================================================================================
IndustrialMech Cost
-------------------------------------------------------------------------------------------------------------------------------
  Structural Cost:                                                                             2,494,000.00                    
  Weapons and Equipment Cost:                                                         (+)        100,500.00  =     2,594,500.00
  IndustrialMech Cost Multiplier:            1 + (50 / 400)                           (*)              1.13  =     2,918,812.50
-------------------------------------------------------------------------------------------------------------------------------
Final IndustrialMech Cost                                                                                          2,918,813.00
 |