Cost Breakdown
Name/Model: Zephyr Hovertank (Royal)
Technology: Inner Sphere
Tonnage: 40
Configuration: Hover Combat Vehicle
=======================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (125 pts) 7.0 x 20,000 140,000.00
Internal Structure (Standard) 4.0 x 10,000 (+) 40,000.00 = 180,000.00
Control Components 2 x 10,000 (+) 20,000.00 = 200,000.00
Lift/Dive Equipment 4 x 20,000 (+) 80,000.00 = 280,000.00
Engine (Fusion) (5,000 x 185 x 40) / 75 (+) 493,333.33 = 773,333.33
Turret 0.5 x 5,000 (+) 2,500.00 = 775,833.33
-----------------------------------------------------------------------------------------------------------------------
Total Structural Cost 775,833.33
=======================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------------
Guardian ECM Suite 200,000 200,000.00
Medium Laser 40,000 (+) 40,000.00 = 240,000.00
Medium Laser 40,000 (+) 40,000.00 = 280,000.00
Medium Laser 40,000 (+) 40,000.00 = 320,000.00
Narc Missile Beacon 100,000 (+) 100,000.00 = 420,000.00
Narc Missile Beacon (Ammo 6) [Homing] [Empty Bin] 0 (+) 0.00 = 420,000.00
Narc Missile Beacon (Ammo 6) [Homing] [Empty Bin] 0 (+) 0.00 = 420,000.00
Small Laser 11,250 (+) 11,250.00 = 431,250.00
TAG 50,000 (+) 50,000.00 = 481,250.00
-----------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 481,250.00
=======================================================================================================================
Combat Vehicle Cost
-----------------------------------------------------------------------------------------------------------------------
Structural Cost 775,833.33
Weapons and Equipment Cost (+) 481,250.00 = 1,257,083.33
Combat Vehicle Cost Multiplier 1 + (40 / 50) (*) 1.8 = 2,262,750.00
-----------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 2,262,750.00
|