|                  Cost Breakdown
Name/Model:         Burrower DTM-1 MiningMech
Technology:         Inner Sphere
Tonnage:            65
Configuration:      Biped IndustrialMech
=============================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------------------
  Armor (Heavy Industrial):                (88 pts) 5.5 x 10,000                                55,000.00                    
  Internal Structure (Industrial):         65 x 300 x 1                             (+)         19,500.00  =        74,500.00
  Myomer (Standard):                       65 x 2,000                               (+)        130,000.00  =       204,500.00
  Engine (Internal Combustion):            (1,250 x 195 x 65) / 75                  (+)        211,250.00  =       415,750.00
  Gyro (Standard):                         2.0 x 300,000                            (+)        600,000.00  =     1,015,750.00
  Cockpit (Industrial):                    100,000                                  (+)        100,000.00  =     1,115,750.00
  Life Support:                            50,000                                   (+)         50,000.00  =     1,165,750.00
  Sensors:                                 65 x 2,000                               (+)        130,000.00  =     1,295,750.00
  Heat Sinks (Single):                     1 x 2,000                                (+)          2,000.00  =     1,297,750.00
  Arm Actuators:                           65 x ((100 x 2) + (50 x 2) + (80 x 0))   (+)         19,500.00  =     1,317,250.00
  Leg Actuators:                           65 x ((150 x 2) + (80 x 2) + (120 x 2))  (+)         45,500.00  =     1,362,750.00
-----------------------------------------------------------------------------------------------------------------------------
Total Structural Cost:                                                                                           1,362,750.00
=============================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------------------
  Fluid Gun                                35,000                                               35,000.00                    
  Fluid Gun                                35,000                                   (+)         35,000.00  =        70,000.00
  Fluid Gun (Ammo 20) [Water] [Empty Bin]  0                                        (+)              0.00  =        70,000.00
  Fluid Gun (Ammo 20) [Water] [Empty Bin]  0                                        (+)              0.00  =        70,000.00
  Fluid Gun (Ammo 20) [Water] [Empty Bin]  0                                        (+)              0.00  =        70,000.00
  Fluid Gun (Ammo 20) [Water] [Empty Bin]  0                                        (+)              0.00  =        70,000.00
  Fluid Gun (Ammo 20) [Water] [Empty Bin]  0                                        (+)              0.00  =        70,000.00
  Fluid Gun (Ammo 20) [Water] [Empty Bin]  0                                        (+)              0.00  =        70,000.00
  Mining Drill                             100,000                                  (+)        100,000.00  =       170,000.00
  Rock Cutter                              100,000                                  (+)        100,000.00  =       270,000.00
  Tracks                                   (500 x 195 x 65) / 75                    (+)         84,500.00  =       354,500.00
-----------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost                                                                                   354,500.00
=============================================================================================================================
IndustrialMech Cost
-----------------------------------------------------------------------------------------------------------------------------
  Structural Cost:                                                                           1,362,750.00                    
  Weapons and Equipment Cost:                                                       (+)        354,500.00  =     1,717,250.00
  IndustrialMech Cost Multiplier:          1 + (65 / 400)                           (*)              1.16  =     1,996,303.13
-----------------------------------------------------------------------------------------------------------------------------
Final IndustrialMech Cost                                                                                        1,996,303.00
 |