Cost Breakdown
Name/Model:         Giant Guadian Tank
Technology:         Inner Sphere
Tonnage:            80
Configuration:      Wheeled Combat Vehicle
=============================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------
  Armor (Standard)                         (104 pts) 6.5 x 10,000               65,000.00                    
  Internal Structure (Standard)            8.0 x 10,000             (+)         80,000.00  =       145,000.00
  Control Components                       4 x 10,000               (+)         40,000.00  =       185,000.00
  Engine (Fusion)                          (5,000 x 300 x 80) / 75  (+)      1,600,000.00  =     1,785,000.00
  Heat Sinks (Single)                      10 x 2,000               (+)         20,000.00  =     1,805,000.00
  Turret                                   2 x 5,000                (+)         10,000.00  =     1,815,000.00
-------------------------------------------------------------------------------------------------------------
Total Structural Cost                                                                            1,815,000.00
=============================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------
  Communications Equipment (4 ton)         4 x 10000                            40,000.00                    
  LRM 5 (Prototype)                        30,000                   (+)         30,000.00  =        70,000.00
  LRM 5 (Prototype) (Ammo 18) [Empty Bin]  0                        (+)              0.00  =        70,000.00
  PPC                                      200,000                  (+)        200,000.00  =       270,000.00
  PPC                                      200,000                  (+)        200,000.00  =       470,000.00
-------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost                                                                   470,000.00
=============================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------------
  Structural Cost                                                            1,815,000.00                    
  Weapons and Equipment Cost                                        (+)        470,000.00  =     2,285,000.00
  Combat Vehicle Cost Multiplier           1 + (80 / 200)           (*)               1.4  =     3,199,000.00
-------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost                                                                        3,199,000.00
 
		 |