Cost Breakdown
Name/Model: Schrek PPC Carrier (C3S)-GU AUDRA (ER)
Technology: Inner Sphere
Tonnage: 80
Configuration: Tracked Combat Vehicle
=======================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (195 pts) 10.0 x 25,000 250,000.00
Internal Structure (Standard) 8.0 x 10,000 (+) 80,000.00 = 330,000.00
Control Components 4 x 10,000 (+) 40,000.00 = 370,000.00
Engine (Fusion) (5,000 x 240 x 80) / 75 (+) 1,280,000.00 = 1,650,000.00
Heat Sinks (Single) 5 x 2,000 (+) 10,000.00 = 1,660,000.00
Turret 3 x 5,000 (+) 15,000.00 = 1,675,000.00
-------------------------------------------------------------------------------------------------------
Total Structural Cost 1,675,000.00
=======================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------
Angel ECM Suite 750,000 750,000.00
C3 Slave 250,000 (+) 250,000.00 = 1,000,000.00
CASE 50,000 (+) 50,000.00 = 1,050,000.00
ER PPC 300,000 (+) 300,000.00 = 1,350,000.00
MRM 20 (Ammo 12) [Empty Bin] 0 (+) 0.00 = 1,350,000.00
MRM 20 w/ Apollo FCS 125,000 + 125,000 (+) 250,000.00 = 1,600,000.00
MRM 30 (Ammo 8) [Empty Bin] 0 (+) 0.00 = 1,600,000.00
MRM 30 (Ammo 8) [Empty Bin] 0 (+) 0.00 = 1,600,000.00
MRM 30 w/ Apollo FCS 225,000 + 125,000 (+) 350,000.00 = 1,950,000.00
-------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,950,000.00
=======================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------
Structural Cost 1,675,000.00
Weapons and Equipment Cost (+) 1,950,000.00 = 3,625,000.00
Combat Vehicle Cost Multiplier 1 + (80 / 100) (*) 1.8 = 6,525,000.00
-------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 6,525,000.00
|