Cost Breakdown
Name/Model: Clan Arrow IV (Trailer)
Technology: Clan
Tonnage: 28
Configuration: Wheeled Combat Vehicle
======================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------------
Armor (Standard) (136 pts) 8.5 x 10,000 85,000.00
Internal Structure (Standard) 3.0 x 10,000 (+) 30,000.00 = 115,000.00
Control Components 0 x 10,000 (+) 0.00 = 115,000.00
Engine (None) (+) 0.00 = 115,000.00
Turret 1.5 x 5,000 (+) 7,500.00 = 122,500.00
----------------------------------------------------------------------------------------------------------------------
Total Structural Cost 122,500.00
======================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------------
Arrow IV System 450,000 450,000.00
Arrow IV System (Ammo 5) [Non-Homing] [Empty Bin] 0 (+) 0.00 = 450,000.00
Arrow IV System (Ammo 5) [Non-Homing] [Empty Bin] 0 (+) 0.00 = 450,000.00
Arrow IV System (Ammo 5) [Non-Homing] [Empty Bin] 0 (+) 0.00 = 450,000.00
CASE 1 x 50,000 (+) 50,000.00 = 500,000.00
Trailer Hitch 0 (+) 0.00 = 500,000.00
----------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 500,000.00
======================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------------
Structural Cost 122,500.00
Weapons and Equipment Cost (+) 500,000.00 = 622,500.00
Combat Vehicle Cost Multiplier 1 + (28 / 200) (*) 1.14 = 709,650.00
----------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 709,650.00
|