Cost Breakdown
Name/Model: Ectoplasm Scout Tank
Technology: Inner Sphere (Mixed)
Tonnage: 50
Configuration: Hover Combat Vehicle
=================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------
Armor (Vehicular Stealth) (80 pts) 5.0 x 50,000 250,000.00
Internal Structure (Standard) 5.0 x 10,000 (+) 50,000.00 = 300,000.00
Control Components 2.5 x 10,000 (+) 25,000.00 = 325,000.00
Lift/Dive Equipment 5 x 20,000 (+) 100,000.00 = 425,000.00
Engine (Fusion) (5,000 x 165 x 50) / 75 (+) 550,000.00 = 975,000.00
Turret 1 x 5,000 (+) 5,000.00 = 980,000.00
-----------------------------------------------------------------------------------------------------------------
Total Structural Cost 980,000.00
=================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------
Communications Equipment (3 ton) 3 x 10000 30,000.00
Drone Carrier Control System (3 drones) 3.5 x 10,000 (+) 35,000.00 = 65,000.00
Drone Operating System 5,000 + (5.5 x 10,000) (+) 60,000.00 = 125,000.00
Guardian ECM Suite 200,000 (+) 200,000.00 = 325,000.00
Heavy Machine Gun (C) 7,500 (+) 7,500.00 = 332,500.00
Heavy Machine Gun (Ammo 50) [Empty Bin] (C) 0 (+) 0.00 = 332,500.00
TAG 50,000 (+) 50,000.00 = 382,500.00
Ultra AC/2 (C) 120,000 (+) 120,000.00 = 502,500.00
Ultra AC/2 (Ammo 45) [Empty Bin] (C) 0 (+) 0.00 = 502,500.00
-----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 502,500.00
=================================================================================================================
Combat Vehicle Cost
-----------------------------------------------------------------------------------------------------------------
Structural Cost 980,000.00
Weapons and Equipment Cost (+) 502,500.00 = 1,482,500.00
Combat Vehicle Cost Multiplier 1 + (50 / 50) (*) 2 = 2,965,000.00
-----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 2,965,000.00
|