Cost Breakdown
Name/Model: Behemoth Heavy Tank (SD) "Safety Dance"
Technology: Inner Sphere
Tonnage: 100
Configuration: Tracked Combat Vehicle
=================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (304 pts) 17.0 x 20,000 340,000.00
Internal Structure (Standard) 10.0 x 10,000 (+) 100,000.00 = 440,000.00
Control Components 5 x 10,000 (+) 50,000.00 = 490,000.00
Engine (Fusion) (5,000 x 200 x 100) / 75 (+) 1,333,333.33 = 1,823,333.33
Turret 3 x 5,000 (+) 15,000.00 = 1,838,333.33
-----------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,838,333.33
=================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------
C3 Slave 250,000 250,000.00
CASE 50,000 (+) 50,000.00 = 300,000.00
Combat Vehicle Escape Pod 10,000 (+) 10,000.00 = 310,000.00
Guardian ECM Suite 200,000 (+) 200,000.00 = 510,000.00
Laser Anti-Missile System 225,000 (+) 225,000.00 = 735,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 1,135,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 1,535,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,535,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,535,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,535,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,535,000.00
Light Machine Gun 5,000 (+) 5,000.00 = 1,540,000.00
Light Machine Gun 5,000 (+) 5,000.00 = 1,545,000.00
Light Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 1,545,000.00
MML 5 75,000 (+) 75,000.00 = 1,620,000.00
MML 5 75,000 (+) 75,000.00 = 1,695,000.00
MML 5 75,000 (+) 75,000.00 = 1,770,000.00
MML 5 75,000 (+) 75,000.00 = 1,845,000.00
MML 5 (Ammo 20) [SRM] [Empty Bin] 0 (+) 0.00 = 1,845,000.00
MML 5 (Ammo 20) [SRM] [Empty Bin] 0 (+) 0.00 = 1,845,000.00
MML 5 (Ammo 24) [LRM] [Empty Bin] 0 (+) 0.00 = 1,845,000.00
MML 5 (Ammo 24) [LRM] [Empty Bin] 0 (+) 0.00 = 1,845,000.00
-----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,845,000.00
=================================================================================================================
Combat Vehicle Cost
-----------------------------------------------------------------------------------------------------------------
Structural Cost 1,838,333.33
Weapons and Equipment Cost (+) 1,845,000.00 = 3,683,333.33
Combat Vehicle Cost Multiplier 1 + (100 / 100) (*) 2 = 7,366,666.67
-----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 7,366,667.00
|