Cost Breakdown
Name/Model: Schrek PPC Carrier (C3S)-GU-2
Technology: Inner Sphere
Tonnage: 80
Configuration: Tracked Combat Vehicle
========================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (208 pts) 10.5 x 25,000 262,500.00
Internal Structure (Standard) 8.0 x 10,000 (+) 80,000.00 = 342,500.00
Control Components 4 x 10,000 (+) 40,000.00 = 382,500.00
Engine (XL) (20,000 x 240 x 80) / 75 (+) 5,120,000.00 = 5,502,500.00
Heat Sinks (Single) 10 x 2,000 (+) 20,000.00 = 5,522,500.00
Turret 3 x 5,000 (+) 15,000.00 = 5,537,500.00
--------------------------------------------------------------------------------------------------------
Total Structural Cost 5,537,500.00
========================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------
Angel ECM Suite 750,000 750,000.00
C3 Slave 250,000 (+) 250,000.00 = 1,000,000.00
CASE 50,000 (+) 50,000.00 = 1,050,000.00
Heavy PPC 250,000 (+) 250,000.00 = 1,300,000.00
MRM 20 (Ammo 12) [Empty Bin] 0 (+) 0.00 = 1,300,000.00
MRM 20 w/ Apollo FCS 125,000 + 125,000 (+) 250,000.00 = 1,550,000.00
MRM 30 (Ammo 8) [Empty Bin] 0 (+) 0.00 = 1,550,000.00
MRM 30 w/ Apollo FCS 225,000 + 125,000 (+) 350,000.00 = 1,900,000.00
PPC Capacitor 150,000 (+) 150,000.00 = 2,050,000.00
--------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 2,050,000.00
========================================================================================================
Combat Vehicle Cost
--------------------------------------------------------------------------------------------------------
Structural Cost 5,537,500.00
Weapons and Equipment Cost (+) 2,050,000.00 = 7,587,500.00
Combat Vehicle Cost Multiplier 1 + (80 / 100) (*) 1.8 = 13,657,500.00
--------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 13,657,500.00
|